Quality methodology

How we review your project before delivery

Every project has clear review criteria. We log each finding by type and severity, then have a specialist verify the correction before sign-off.

The criteria follow the work: its language, market, audience, intended use, risks and style guide.

01Criteria

A review profile built for the project

Before review, we confirm the language, market, content type, audience, style guide and delivery requirements. Then we tailor the criteria to the work.

LanguageMarketAudienceContent typeStyle guideTerminologyUsage risks
  • Translation and localisation: meaning, terminology, language, style and market fit.
  • Arabic content: language, style, terminology and audience fit.
  • Localised design: text, design elements, and writing direction, with a separate technical RTL check where needed.
  • Subtitling: accuracy of the text and translation, alongside a review of timing, reading speed and line length.

With the criteria set, the review begins.

02Review and classification

Every finding tracked through to resolution

We record each finding in context, explain why it matters and recommend a correction. Then we track it through to resolution.

Illustrative example

A missing negation reversed security advice

Before review

Source

Never share your password with anyone.

Current translation

شارك كلمة مرورك مع أي شخص.

Finding · Critical · 25

Issue

The negation was omitted, reversing a security instruction.

Decision

Approval stayed on hold until correction and verification.

After correction

Correction

لا تشارك كلمة مرورك مع أي شخص.

Status

Verified before delivery

With findings recorded, the specialist review begins.

03Automated checks and specialist review

Tools flag risks. The specialist decides.

Automated checks

Automated checks flag potential risks. When used, AI tools can suggest how to classify or correct a finding.

The reviewer

A specialist checks each finding, accepts it, changes its classification or rejects it, and takes responsibility for approving the final version.

We record the reviewer’s name and decisions so each review step can be traced.

04Scoring and approval gate

A critical issue blocks approval

The report shows the score before and after correction, alongside the reviewer’s decision.

An open Critical finding always holds approval, whatever the overall score. Each project sets its own acceptance threshold.

ACCEPTEDACCEPTED WITH NOTESREVIEW REQUIREDNOT ACCEPTED
Open critical findingApproval on holdON HOLD — CRITICAL FINDING

05Sample report

SARDIllustrative · fictional case

A complete sample review, decision by decision

This fictional sample covers a 1,000-word security translation. A critical error reverses a safety instruction, so delivery stays on hold until a specialist verifies the correction.

Before correction69/100On hold · open critical finding
After correction100/100Ready for final review

Findings and disposition

QF-01 · Critical · 25 pointsResolved
Source
Never share your password with anyone.
Submitted translation
شارك كلمة مرورك مع أي شخص.
Correction
لا تشارك كلمة مرورك مع أي شخص.
Impact
The missing negation reversed a security instruction. Delivery stayed on hold until a specialist verified the correction.
QF-02 · Major · 5 pointsResolved

Advice to use a different password for each account was changed to use one password everywhere. The recommendation was corrected and checked again.

QF-03 · Minor · 1 pointResolved

A punctuation inconsistency was corrected to match the approved style guide.

Illustrative calculation: 31 penalty points across a 1,000-word evaluation. The open Critical finding blocks approval regardless of the total score. Once all three findings are corrected and verified, the sample reaches 100/100.

Download the full sample report

Next step

See how this review works on your material.

Share a short excerpt to request a free sample review.

Request a free sample

Method references

Referencing MQM and ISO does not mean Sard is certified or endorsed by either.

Scoring weights and sources

Severity weights used in this illustrative example:

  • Neutral: 0
  • Minor: 1
  • Major: 5
  • Critical: 25

This sample uses a 1,000-word evaluation and project-specific acceptance rules. An open Critical finding blocks approval.

References: MQM-Full Master taxonomy and the MQM 2.0 Dual Scorecard. MQM source reference